Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | Emission Standard |
Governed (kW@RPM) |
Peak Torque (Nm@RPM) |
Cylinders | Displacement (Liters) |
4BTAA3.9-C80 | Euro II | 60@2200 | 370@1300 | 4 | 3.9 |
4BTAA3.9-C100 | Euro II | 74@2200 | 400@1500 | 4 | 3.9 |
4BTAA3.9-C125 | Euro II | 93@2200 | 480@1400 | 4 | 3.9 |
4BTAA3.9-C130 | Euro II | 97@2500 | 510@1400 | 4 | 3.9 |
4BTA3.9-C80 | Euro II | 60@2200 | 350@1500 | 4 | 3.9 |
4BTA3.9-C100 | Euro II | 74@2200 | 380@1500 | 4 | 3.9 |
4BTA3.9-C110 | Euro II | 82@2200 | 460@1400 | 4 | 3.9 |
4BTA3.9-C125 | Euro II | 93@2300 | 475@1500 | 4 | 3.9 |
4BTA3.9-C130 | Euro II | 97@2500 | 475@1500 | 4 | 3.9 |
Hubei Shiyuan Power Technology Co., Ltd., proudly situated in the High-tech Industrial Development Zone of Xiangyang City, Hubei Province, excels as a comprehensive provider, masterfully blending engine parts production, cutting-edge engine R&D, and robust sales strategies, alongside the innovative manufacturing and distribution of engineering machinery engine power packs. We encompass an extensive range of engineering machinery support products including crushers, trenchless horizontal directional drillers, mining trucks, loaders, excavators, road rollers, graders, air compressors, drilling rigs, oilfield and specialized equipment, with an impressively broad power spectrum.
The company steadfastly upholds the philosophy of 'customer first, excellence, independent innovation, pursuit of excellence,' meticulously crafting high-quality products as tokens of appreciation to our users. We aim to delight both domestic and international clients with our sterling reputation and attentive service, always prioritizing the interests of our partners.
Question 1:How to buy an engine?
Please tell us what machine do you use the engine for, the rated power and speed of the engine you need, then we will select the model suitable for you based on these three information.
Question 2:What is your payment term?
Answer: we accept T/T and L/C.
Question 3:What is your MOQ?
Answer: MOQ is 1 set.
Question 4:How long is the delivery time?
For complete engine and Power units , we need to arrange production according to the order, our general delivery time is 15-30 days.
For spare parts , our general delivery time is 5-15 days.
Question 5:What is your wanrranty?
Answer: We offer a one-year guarantee.
Question 6:Do you test all your goods before delivery?
Answer: yes we have 100% test before delivery.